Published June 22, 2024
| Version v1
Publication
Open
Optimization of Lead Time in Jewellery Manufacturing: Differentiation in Design and Model
Files
08.38-46.pdf
Files
(231.4 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:1a7a19633b54faf25a7c4928ff32c341
|
231.4 kB | Preview Download |
Additional details
Identifiers
- EISSN
- 3025-0129
Related works
- Is documented by
- Publication: https://jurnal.akseprin.org/index.php/MJAI/article/view/172 (URL)
Dates
- Issued
-
2024-06-22
References
- Lertkachonsuk, P. (2017). PRODUCT DESIGN PROCESS IMPROVEMENT FOR A JEWELLERY MANUFACTURER. Lin, F., Wong, M. C., & Ge, M. (2018). Development of the digital model of the jewellery production process for resource optimisation and prediction. HKIE Transactions, 25(4), 229–236. Lukitaputri, A. A., Dachyar, M., & Yadrifil, Y. (2015). Designing jewellery manufacturing industry productivity improvement using DMAIC method. International Journal of Applied Engineering Research, 10(13), 33836–33841. Supsomboon, S. (2019). Simulation for jewelry production process improvement using line balancing: a case study. Management Systems in Production Engineering, (3 (27), 127–137.