Published June 22, 2024 | Version v1
Publication Open

Optimization of Lead Time in Jewellery Manufacturing: Differentiation in Design and Model

Authors/Creators

  • 1. Engineering Department, University of Nicosia Africa, Zambia

Files

08.38-46.pdf

Files (231.4 kB)

Name Size Download all
md5:1a7a19633b54faf25a7c4928ff32c341
231.4 kB Preview Download

Additional details

Identifiers

EISSN
3025-0129

Related works

Dates

Issued
2024-06-22

References

  • Lertkachonsuk, P. (2017). PRODUCT DESIGN PROCESS IMPROVEMENT FOR A JEWELLERY MANUFACTURER. Lin, F., Wong, M. C., & Ge, M. (2018). Development of the digital model of the jewellery production process for resource optimisation and prediction. HKIE Transactions, 25(4), 229–236. Lukitaputri, A. A., Dachyar, M., & Yadrifil, Y. (2015). Designing jewellery manufacturing industry productivity improvement using DMAIC method. International Journal of Applied Engineering Research, 10(13), 33836–33841. Supsomboon, S. (2019). Simulation for jewelry production process improvement using line balancing: a case study. Management Systems in Production Engineering, (3 (27), 127–137.