Final report on experimental validation, demonstration and lessons learned (D1.4-SP3)
Authors/Creators
Description
This deliverable updates D1.2 [1] and reports the final tests carried out on integration and experimental validation of the TIMING solutions. The tests performed are all those planned and described in D1.1 for demonstration of the TIMING architecture and use cases.
The integration tests and demonstrations reported in this document were carried out in different testing rounds in June and October 2024, in the 5G Telefonica Open Network Innovation Center (5TONIC), located in Leganes (Madrid), and in December 2024, in the facilities of the Escuela Politécnica Superior in the Milanera Campus (Burgos). During the last round, Automated Guided Vehicles (AGV) where physically deployed to perform the final demonstration. The obtained KPIs for each test are reported.
Finally, recommendations and lessons learned on TSN and their application to industrial scenarios are provided.
Files
TIMING SP-3-D1.4_20240131.pdf
Files
(10.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:3c868d10d76048bf802c0acc52073d18
|
10.3 MB | Preview Download |