Published December 15, 2025 | Version v1

Demonstrated version of software components (D1.3-SP3)

Authors/Creators

Description

This deliverable describes the demonstrated version of the software modules that have been developed and integrated in the framework of the TIMING project. It reports the final status of each of the software components of the defined architecture, as well as the unitary tests carried out to validate implementations.

This deliverable is structured as follows: Section 1 briefly summarizes the TIMING architecture to position each of the software components. The list of software components is summarized in Section 2, including the name and a summary of the software component, the type of license and the link where the software can be accessed, if applicable. Sections 3-11 are devoted to the different software components, where each section includes an overview of the module and reports the final development status, as a follow-up of the previous software releases. The tests run to validate the implementations are also deeply described. Main components are:

·        Aautomated guided vehicle (AGV)

·        TSN Controller

·        Wireless Flow Scheduler

·        TSN Connectivity Manager

·        TSN Ethernet Switch

·        Digital Twin (DT)

·        TSN E2E Monitoring

Finally, Section 12 draws some conclusions.

Files

TIMING - SP3 - D1.3_20240127.pdf

Files (3.2 MB)

Name Size Download all
md5:d683e39e2cd977a4a837242d3c0a27a1
3.2 MB Preview Download