Year 2 report on experimental validation and demonstration (D1.2-SP3)
Authors/Creators
Description
This deliverable updates D1.1 [1] and reports the progress on integration and experimental validation of the TIMING solutions. The tests performed are a subset of those described in D1.1 and constitute a preliminary version of the experiments planned for demonstration of the TIMING architecture and use cases.
The integration tests and demonstrations reported in this document were carried out in two different testing rounds in June and October 2024, in the 5G Telefonica Open Network Innovation Center (5TONIC), located in Leganes (Madrid). During the last round, two Automated Guided Vehicles (AGV) where physically deployed to perform tests with real AGVs.
Files
TIMING -SP3 D1.2_20241108.pdf
Files
(13.0 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:390cddd5cde03c437033fb261df2bf98
|
13.0 MB | Preview Download |