Final Report on Requirements, Architecture and Performance Evaluation (D1.5-SP1)
Authors/Creators
Description
This document updates deliverable D1.4 with the activities carried out within WP1 during the third year of the TIMING project, providing updated specifications of the TIMING components and preliminary performance evaluations.
The document reports the final specifications of the components of the TIMING solution, an updated version of the network operator’s perspective and the industrial use cases and applications of the TIMING solutions, and performance evaluation of the TIMING solutions.
Files
TIMING - D1.5_20241230.pdf
Files
(3.7 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:4bde9ffe856fb1d0fec9f0d1e6ccc369
|
3.7 MB | Preview Download |