Overall Equipment Effectiveness and Downtime datasets in Heavy Clay production line

  • 1. ROR icon University of Cyprus

Contributors

Hosting institution:

  • 1. ROR icon University of Cyprus

Description

The Overall Equipment Effectiveness (OEE) datasets (before and after Lean Six Sigma implementation) contain line-level OEE data per shift. Column labels are: Shift Date, OEE, Availability, Performance, Quality, Sum of Good Production Time, Sum of Slow Production Time, Sum of Planned time, Sum of ideal Production Quantity, Sum of planned Stops Time (sec), Sum of unplanned Stops Time (sec), Sum of Good Quantity, Sum of Total Quantity. Descriptive data are written in the English language.

The Downtime datasets (before and after Lean Six Sigma implementation) contain downtime data, such as duration, stop locations, stop reasons, and operator comments. Specifially column labels are: Date, Product Code, Stop Reason, Stop Type, Stop Location, Extra Text (from operator), Stop start time, Stop end Time and Stop duration (min). Descriptive data are written in the English language, except for the extra text field (input by the machine operator) that was kept in Greek to maintain raw data and avoid translation mistakes. 

Data collection was implemented through real-time OEE tracking specialised software (Evocon). The data correspond to the whole production line, ranging from clay extrusion to brick packaging. 

Files

DowntimeDataset.csv

Files (3.2 MB)

Name Size Download all
md5:7b46e04694809a1c510c2ff1c48d0a50
91.3 kB Preview Download
md5:bb192fb4fccb945f679f85a2c52530e0
3.1 MB Preview Download
md5:f271a9a337fe58f8bc5c9eda2d38f43d
5.6 kB Preview Download
md5:806676e334595f3914d4646e286473a3
4.7 kB Preview Download
md5:8e4ce0f186f162c902f2bf7acf4386bc
8.2 kB Preview Download

Additional details

Related works

Is described by
Poster: 10.5281/zenodo.17855916 (DOI)

Funding

Research and Innovation Foundation
Lean Six Sigma, Industry 4.0 and Smart Predictive Maintenance Integration in the Heavy Clay Industry PhD in Industry/1123/0108

Dates

Collected
2025-09-22
Date of production start
Collected
2025-12-18
Date of production end