Published December 3, 2025 | Version v1

2025 Alaska Railbelt Net Metering Update

Authors/Creators

  • 1. ROR icon Alaska Center for Energy and Power

Description

The 2025 Alaska Railbelt Net Metering Update is a summary of the growth of the installed net metered distributed generation capacity on the Alaska Railbelt during 2024 as reported in utility filings submitted to the Regulatory Commission of Alaska (RCA). The Alaska Railbelt is a 700-mile-long transmission corridor built beside a vital rail line that spans from Fairbanks, through Anchorage and Homer.

Files

2025NetMeteringReport_Final.pdf

Files (580.8 kB)

Name Size Download all
md5:49111dd154523f7493ef1afd4190ac5b
580.8 kB Preview Download

Additional details

Funding

Office of Naval Research
Alaska Regional Collaboration for Technology Innovation and Commercialization N00014-19-1-2235