Published December 3, 2025
| Version v1
Report
Open
2025 Alaska Railbelt Net Metering Update
Description
The 2025 Alaska Railbelt Net Metering Update is a summary of the growth of the installed net metered distributed generation capacity on the Alaska Railbelt during 2024 as reported in utility filings submitted to the Regulatory Commission of Alaska (RCA). The Alaska Railbelt is a 700-mile-long transmission corridor built beside a vital rail line that spans from Fairbanks, through Anchorage and Homer.
Files
2025NetMeteringReport_Final.pdf
Files
(580.8 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:49111dd154523f7493ef1afd4190ac5b
|
580.8 kB | Preview Download |
Additional details
Funding
- Office of Naval Research
- Alaska Regional Collaboration for Technology Innovation and Commercialization N00014-19-1-2235