Published April 11, 2023 | Version v1
Report Open

Tusass Connect Marine Route Survey report. Seabed survey feasibility study in Nuuk archipelago. Technical Report No. 126

Description

This report covers a survey of the seabed to find a suitable route for installing submarine cables
from the Atlantic to Nuuk.
The survey on board R/V Tarajoq was conducted over 48 hours starting and ending in Nuuk. Due 
to bad weather along the west coast of Greenland, it was not possible to cover the remaining areas. During the study, the coverage and data quality obtained were verified as suitable for the 
purpose.

Files

Nr-126-Tusass-Connect-Marine-Route-Survey-report.-Seabed-survey-feasibility-study-in-Nuuk-archipelago-v1.pdf