Published November 11, 2025 | Version v1

Feasibility Assessment versus Real-World Performance: A Case Study of the Karnaphuli River Tunnel Project and Its Economic Implications for Bangladesh

Authors/Creators

Description

The Karnaphuli River Tunnel Project, Bangladesh’s first underwater tunnel, marks a major milestone in the country’s infrastructure development under the Belt and Road Initiative (ADB, 2020). This study examines the contrast between the project’s feasibility assessment and its real-world performance, focusing on technical, financial, and socio-economic aspects. The feasibility study predicted significant improvements in regional connectivity, trade efficiency, and national economic growth (China Communications Construction Company, 2018). However, the implementation phase faced challenges such as cost escalation, construction delays, and environmental impacts (Rahman & Ahmed, 2022). By comparing the projected outcomes with actual post-construction realities, this research evaluates the reliability of feasibility assessments in large-scale infrastructure projects in developing nations (World Bank, 2021). The findings underscore the importance of adaptive project management, realistic cost-benefit analysis, and continuous monitoring to minimize the planning–implementation gap (Hasan et al., 2023). Ultimately, the study provides insights into improving future infrastructure feasibility evaluations to enhance economic efficiency and sustainable development in Bangladesh.

Files

(45-55)Feasibility Assessment versus Real.pdf

Files (410.0 kB)

Name Size Download all
md5:9f71af945b5e3e655f66a1a469d19420
410.0 kB Preview Download

Additional details

References

  • 1. Asian Development Bank (ADB). (2023). Post-construction assessment report: Karnaphuli River Tunnel Project. Manila: ADB.
  • 2. Bangladesh Bridge Authority (BBA). (2024). Karnaphuli River Tunnel Project: Progress and cost report. Dhaka: BBA.
  • 3. China Communications Construction Company. (2018). Feasibility study report: Karnaphuli River Tunnel Project. Beijing: CCCC.
  • 4. Hasan, M., Chowdhury, T., & Alam, S. (2023). Infrastructure project performance and risk management in Bangladesh. Journal of Infrastructure Development, 12(2), 45–58.
  • 5. Rahman, K., & Ahmed, R. (2022). Cost overrun and schedule delay in large infrastructure projects in Bangladesh. Bangladesh Journal of Engineering and Management, 9(1), 60–72.
  • 6. World Bank. (2021). Performance review of major transport infrastructure projects in South Asia. Washington, DC: World Bank.
  • 7. Asian Development Bank (ADB). (2020). SASEC Chattogram–Cox's Bazar Railway Project: Project feasibility report.
  • 8. China Communications Construction Company. (2018). Feasibility study report on the Karnaphuli River Tunnel project.
  • 9. Hasan, M., Chowdhury, T., & Alam, S. (2023). Evaluating infrastructure project performance in Bangladesh. Journal of Infrastructure Development, 12(2), 45–58.
  • 10. Rahman, K., & Ahmed, R. (2022). Cost overrun and time delay analysis of megaprojects in Bangladesh. Bangladesh Journal of Engineering and Management, 9(1), 60–72.