Published November 9, 2025 | Version 1.2

Schrödingher : Quantum-Hybrid ERP Solutions for Next-Generation Logistics: Commercial Value Proposition and Strategic Funding Alignment

  • 1. Q-bit
  • 2. Borel Sigma Inc

Contributors

Research group:

  • 1. Zi-us Inc

Description

Metric Validation: Planning Time Reduction (4 Hours to 15 Minutes)

The "Schrodingher" claim of reducing planning time from 4 hours (240 minutes) to 15 minutes—a 93.75% reduction (User Data)—is not merely plausible; it is the primary, documented use case for hybrid quantum-annealing solutions in optimization.

  • Industry Precedent: A proof-of-concept project between D-Wave and BASF, one of the world's leading chemical companies, used a hybrid-quantum application to optimize manufacturing workflows. The solution reduced production scheduling time from 10 hours to just seconds.3

  • Case Study Data: A separate D-Wave case study on scheduling applications demonstrated an 80% reduction in scheduling time, collapsing a multi-hour process into minutes.4

  • Operational Context: The 4-hour and 15-minute figures are not arbitrary; they are deeply rooted in logistics operations, frequently cited in academic and industry papers as windows for data processing, driver time constraints, or penalty thresholds.5

 

Files

Quantum Logistics ERP for Clients.pdf

Files (880.1 kB)

Name Size
md5:54852c26ce33bf01c9ad231016408c18
880.1 kB Preview Download

Additional details

Dates

Submitted
2025-11-05