Published October 21, 2025 | Version v.0.1
Project deliverable Open

Reincarnate Deliverable D1.4 Integrated information management for circular value flow planning

Description

This deliverable D1.4 highlights the challenges connected to reuse and recycling of construction and demolition waste in the EU and describes the method and tools needed to enable circular value flow planning.

Further, this deliverable explains the innovation BIM for circular value flow planning and dives deeper into the material path of flat glass, which is used as a case for demonstrating the innovation in work package 5.

This deliverable also presents the different data flow hypotheses for enabling BIM for circular value flow planning within the context of flat glass recycling, also diving deeper into the possibilities of reuse of flat glass.

Files

D1.4 Integrated information management for circular value flow planning).pdf

Additional details

Funding

European Commission
Reincarnate - Reincarnation of construction products and materials by slowing down and extending cycles 101056773

Dates

Submitted
2025-05-19