Published October 21, 2025 | Version v1
Physical object Open

A Simulation-based Benchmark for LiDAR SLAM in featureless Tunnels with a novel Robustness Evaluation

  • 1. ROR icon Virtual Vehicle (Austria)
  • 2. EDMO icon Graz University of Technology
  • 3. ROR icon Montanuniversität Leoben

Description

The simulated environment is part of the tunnel system in the Zentrum am Berg (ZaB), located within the terraced mining area of Erzberg, near Eisenerz in Austria. The ZaB facility offers a total length of 4 km of tunnels and mining galleries for testing and training. Our proposed tunnel model covers 1.5 km of it and comprises 2 parallel highway tunnels and 2 parallel railway tunnels, interconnected by cross passages and galleries. The tunnels are around 8 (railway) or 10 meters (highway) wide and 7 meters high with flat terrain and slight curvature. Unlike the mining tunnels in the SubT-Tunnel dataset, characterized by abundant planar and edge features, ZaB is a traffic tunnel system with a highly simplified architectural structure, lacking distinguished construction elements such as platforms or columns. It inherently exhibits large-scale homogeneous characteristics.

 Quick start
• Install Gazebo Ignition
• Download the ZaB-Model folder
• Get into the /ZaB_Model/models/ folder
• Start the simulaiton with the command:
ign gazebo -v 4 -r zab_vehicle.sdf

Files

ZaB_Model.zip

Files (261.0 MB)

Name Size Download all
md5:a0409a2c449f67bf5a80d1ac91714886
261.0 MB Preview Download

Additional details

Funding

European Commission
A-IQ Ready - Artificial Intelligence using Quantum measured Information for realtime distributed systems at the edge 101096658