Solar Hydroelectric Energy: a Challenge forSustainability and AI/IT-Energy Needs
Authors/Creators
Contributors
Other:
Description
After explaining the reasons why energy is one of the challenges for the future, regardless of hu-man choices in many other fields, the author emphasizes how the entire EU, including Italy, remains highlydependent on energy. Without being able to reject other conventional sources in times of crisis, under penaltyof regression and decline, the need to exploit solar energy is thus imperative, despite the volatility of photo-voltaic or wind generation and the resulting risks and constraints to which a highly interconnected electricitygrid exposes. This is also reflected in the risks of an isolated or poorly interconnected grid, which requiresregulation in the context of the expansion of renewables. The author suggests the reasons for moving toward”hydro-solar projects” (hydroelectric pumping units powered by large photovoltaic plants), reclaiming areasof compromised, sometimes polluted, or decommissioned land, and in any case not intended for agriculturaluse. In this context, EU ETSs are therefore seen as a tool that can help pay for these new plants, which exploitrenewable energy and constitute remediation measures, as well as potential energy storage and regulationinfrastructures serving the energy needs of local communities, also promoting their development. Preliminaryand exploratory considerations have led to initial technical, economic, and financial simulations, reported herein tabular and graphical form, which demonstrate the limits of feasibility/bankability in the current contextbased on expected production costs and grid placement prices; prices still significantly higher than those ofthe European market in general. The question therefore arises as to whether land and environmental care andremediation measures, such as the proposed infrastructure measures (electricity grids and new plants to replaceold and polluting ones), which have impact on human health, the planet, and its obsolete infrastructure, shouldbe subject to market rules. In this regard, further reflection is needed, also in view of the more demandingenergy requirements for the spread of AI/IT and the necessary data centers.
Files
IPIL_270.pdf
Files
(5.0 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:70264cbe5e9f3f51ef351d410b91ec1e
|
5.0 MB | Preview Download |