Published September 17, 2025
| Version v1
Project milestone
Open
DataTools4Heart_Milestone MS4_Milestones Achievement Report_M36_WP2
Authors/Creators
- 1. SRDC A.Ş.
- 2. SRDC Software Research Development and Consultancy Corporation
Description
This report outlines the results of DataTools4Heart project, especially WP2, towards the achievement
of Milestone #4 – A modular Data Ingestion Suite with at least 4 standard based data models tested
and validated in 7 European sites.
Milestone #4 was initially due Month 24; we provided a detailed explanation of the work carried out
and the latest status in terms of the test and validation of the Data Ingestion Suite in 7 European sites
at M24. Thanks to the Project Officer, the deadline has been extended to Month 36 to achieve
Milestone #4, and it has been achieved with 4 standard-based data models ingested, and the data
pipeline validated and test in 7 European sites.
Files
DT4H_MS4_M36.pdf
Files
(261.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:75243f02790907f1a231ea45df71ea08
|
261.1 kB | Preview Download |