There is a newer version of the record available.

Published September 15, 2025 | Version v2
Publication Open

The Rail–Phase Hypothesis for Twin Primes: Five Structural Ingredients to proving Twin Prime Infinitude Unconditionally

Authors/Creators

Description

 I propose the Rail–Phase Hypothesis, which asserts that any unconditional proof of the Twin Prime Conjecture must operate within a bounded modular framework that studies primes and composites together, in direct relation to one another. The hypothesis identifies five structural necessities: (i) a bounded modular phase system (our example is on the 6k ±1 rails with 28-phase synchronization via mod 7 drift, but we leave open the possibility of other options) providing the finite control arena, (ii) a prime–composite rail balance that guarantees survivors in every bounded window, (iii) a dispersion ceiling preventing larger primes from erasing those survivors, (iv) a slot alignment mechanism ensuring survivors repeatedly form complete twin slots, and (v) a height condition ensuring survivors are genuine primes.

Files

Twin_Prime_Necessities (1).pdf

Files (229.7 kB)

Name Size Download all
md5:b49bb5cccf898d92e378de1a25ef9507
229.7 kB Preview Download

Additional details

Dates

Created
2025-09-13