Published September 2, 2025 | Version v1
Journal article Open

"Bridging the Planning – Execution Gap: The Impact of Poor Project Planning and Management on Construction Project in Sudan"

  • 1. Sudan University of Science & Technology. Sudan.

Description

This paper assesses the implications of inadequate planning and the weakness of management systems on average performance levels among major infrastructure works in Sudan.

It included key findings from 4 detailed case studies (Khartoum Ring Road, New Khartoum International Airport, Foul Power Plant, Port Sudan Port Expansion)

These weaknesses and failures have resulted in major delays, projects being cancelled or left uncompleted, and rampant cost over-runs.

This paper proposed several criteria using institutional panels (university sector, bonding and independent control (contingent risks) or digital planning tools over the gap between planning to implementation in construction & infrastructure sector in Sudan.

Files

MSIJMR1852025 GS.pdf

Files (461.9 kB)

Name Size Download all
md5:3b29e0b44ab378950d2c6ec6ecf8decd
461.9 kB Preview Download

Additional details

Dates

Accepted
2025-09-02