Global validation report (OPERAS-PLUS Deliverable 1.3)
Authors/Creators
Description
This deliverable provides a global validation report. It is based on the individual WPs in which the deliverables and milestones were processed. Validation is carried out on the basis of the objectives underlying each WP, deviations (if any) from the initial planning are mentioned and explained.
The global validation report is based on the first and second technical reports of the OPERAS-PLUS project, which were prepared by the Consortium respectively at the end of the first period (From M1 to M12) and second period (From M13 to M36) of the project and which detail the work carried out for each Work Package and the main deviations of tasks planning. Thus the global validation report incorporates the elements of these two technical reports, but articulates these elements for each task in order to show the progress of the work between the first and the second period of the project.
This deliverable is currently under review by the European Commission.
Files
Global validation report_OPERAS-PLUS_D1.3_v01.pdf
Files
(796.2 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:cc5f0381a46af45eb529d351983cfbe4
|
796.2 kB | Preview Download |