Published February 28, 2025
| Version 1.0
Project deliverable
Open
D1.8 - Annual progress reports (c)
Description
This deliverable has the structure of the periodic report that is usually submitted before a review. It contains the work, progress, results, etc. for the time period between M19 and M30, and is intended to serve as a summary of the work to be reviewed at the 2nd review meeting scheduled for 24 March 2025.
Files
D1.8_v1.pdf
Files
(1.1 MB)
Name | Size | Download all |
---|---|---|
md5:ea8fae32ab10a4cfc5837d1e385208b8
|
1.1 MB | Preview Download |