Published July 1, 2025 | Version v1

Code and Key Data for "The hidden costs of renewable energy intermittency in China"

Authors/Creators

Description

# SE-LCOE and AVA Evaluation Framework for Renewable Energy in China

This repository contains the **core code and key processed data** supporting the manuscript:

**"The Hidden Costs of Renewable Energy Intermittency in China"**  
Submitted to *Nature Communications*.

The code calculates two central indicators for evaluating renewable energy feasibility:

- **PG** (Power generation)

- **Baseline LCOE** (Baseline Levelized Cost of Electricity without storage)
- **SE-LCOE** (Stabilized Equivalent Levelized Cost of Electricity)
- **AVA** (Available Area for Development)  
...for wind, solar, and hybrid energy systems under multiple storage duration scenarios (4h–24h) across mainland China.

---

## 📁 Folder Structure

### 🔢 Code Scripts

| Filename | Description |
|----------|-------------|
| `01_cal_GHI_CFS_from_ERA5.py` | Calculates solar irradiance and PV capacity factors from ERA5 |
| `01_cal_WPD_CFW_from_ERA5.py` | Calculates wind power density and capacity factors from ERA5 |
| `02_cal_landuse_suitability_for_WT_PV.py` | Evaluates land use suitability based on RESDC datasets |
| `02_cal_Terrain_suitability_for_WT_PV.py` | Assesses terrain (slope) suitability using elevation data |
| `03_cal_ICmax_of_WT_PV.py` | Computes max installable capacity by land + terrain filters |
| `04_cal_max_power_generation_of_WT_PV.py` | Simulates hourly wind and solar generation |
| `05_cal_baseline_LCOE_without_BESS.py` | Computes standard LCOE excluding storage |
| `06_cal_Energy_capacity_of_BESS_diff_duration.py` | Calculates required BESS energy capacity (4h, 8h, 12h, 24h) |
| `07_cal_BESS_Cost.py` | Computes battery system cost under future price scenarios |
| `08_cal_SE-LCOE_with_BESS.py` | Integrates storage cost into generation to compute SE-LCOE |
| `09_cal_AVAArea_rate_region.py` | Calculates AVA (available area below cost threshold) |
| `09_statistic_region.py` | Aggregates SE-LCOE and AVA by region |

---

### 📂 Key Data Folders

| Folder Name | Contents |
|-------------|----------|
| `01_power curve/` | Wind turbine power curve and PV panel specs |
| `02_landuse and terrain/` | Raster or grid data for land cover, slope, and suitability |
| `03_Installed capacity/` | Max installable capacity by grid cell |
| `04_Power generation/` | Hourly wind/PV/hybrid power output simulations |
| `05_07_08_LCOE/` | LCOE, BESS costs, and SE-LCOE data outputs |
| `06_Pcb_SCb/` | Storage power and capacity values under different durations |
| `09_LCOE_AVA_region/` | Final regional results: SE-LCOE and AVA (map/statistics) |

---

 

For questions or collaborations:

Dr. Yang Gao
Key Research Institute of Yellow River Civilization and Sustainable Development
Henan University, China
Email: gaoyang@henu.edu.cn