Gap analyses of Work in progress BIM deliverables on the National Manufacturing Institute Scotland (NMIS) project at RIBA Stage 5
Description
Original MSc dissertation submitted in August 2022 as part of the Master in Advanced Construction Technologies & BIM programme at University of Strathclyde.
This version is shared in its original form, without amendments, to preserve academic integrity.The study investigates how the absence or poor definition of Information Requirements (IRs) impacts the delivery of BIM data for Facilities Management. It includes a practical BIM Audit of the National Manufacturing Institute Scotland (NMIS) project, analysing how real project data aligns or fails to align with expected BIM deliverables.
The research provides clear, evidence based recommendations to improve client-side documentation, project setup, and alignment with ISO 19650 standards for future digital handovers.
Files
EF900-NMIS_MScDissertation_KarolinaJuste_19.08.22.pdf
Files
(14.8 MB)
Name | Size | Download all |
---|---|---|
md5:9ed0e1f972006eb6952900a37ef312a1
|
14.8 MB | Preview Download |
Additional details
Additional titles
- Alternative title (English)
- Gap analyses of WIP BIM deliverables on the NMIS project at RIBA Stage 5
- Alternative title (English)
- Gap analyses of work in progress BIM deliverables on the National Manufacturing Institute Scotland (NMIS) project
- Alternative title (Spanish)
- AnĂ¡lisis de brechas de los entregables BIM en curso en el proyecto del Instituto Nacional de Manufactura de Escocia (NMIS)
Funding
- University of Strathclyde
- Morrison Construction Grant unknown
Dates
- Submitted
-
2022-08-19Original submission date to University of Strathclyde