RES4CITY Case Study: Templederry Community Windfarm (Short version)
Authors/Creators
Description
The case study describes the establishment and success of Ireland's first community-owned wind farm. Initiated by community members with a Certificate in Renewable Energy, the project aimed to revitalize a declining area through renewable energy. Despite challenges such as securing funding and obtaining planning permissions, the community set up a wind development company and installed two turbines. The wind farm’s success led to the creation of Community Power, the first community-owned electricity supplier in Ireland, underlining the shared benefits of renewable energy, especially at a local level. The case study highlights the importance of local ownership and involvement in renewable energy projects, such as wind farms, for community revitalization and a sustainable energy future.
Files
Templederry Community Windfarm_Summary Case study 1 .pdf
Files
(2.6 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:b0d8af5f9bf8aee09a83cb603a80fa74
|
2.6 MB | Preview Download |
Additional details
Related works
- Is variant form of
- 10.5281/zenodo.14007741 (DOI)