Published October 27, 2023 | Version v2

CRONUS Functional Prototype 3 - Copenhagen, Denmark

Description

Functional Prototype 3 (FP3): Syngas Biomethanation The most promising reactor configuration in respect to filling material, operation mode (co- or counter-current operation, Gas and liquid flows, etc) for syngas biomethanation developed within WP4 will be applied in a 70L volume pilot biomethanation reactor. The methanation unit will be used to ferment the gas from biomass pyrolysis unit (or commercial syngas) until stable and continuous operation has been achieved. The Functional prototype 3 will be installed at Copenhagen, Denmark.

Lead: DTU, Partners: BTPRO, CIRAD

Files

CRONUS_FP3.mp4

Files (73.4 MB)

Name Size Download all
md5:808fe3a51bed6b1066e1318a6d42f511
73.4 MB Preview Download

Additional details