Factors Affecting Construction Delay in Residences
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
- 2. Post Graduate Student, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
Description
Abstract: Construction projects in India are facing delays. It is essential to create a clear understanding among experts in the field and carry out an in-depth analysis of the causes of delays because the volume and capacity of the Indian construction sector have changed significantly over the past ten years. Construction delays have a considerable influence on residential projects budgets, schedules, and stakeholder satisfaction. Construction delays are a big issue in the residential construction industry since they increase costs, cause time delays, and disrupt quality. It is crucial to pinpoint the primary causes of these delays in order to reduce the effect they have on project performance. This research study attempts to give a thorough understanding of the factors that contribute to construction delays in residences. This study synthesises previous literature and research findings to investigate a number of factors, their interactions, and their influence on project delays. In order to properly manage and reduce construction delays in residential construction projects, the review underlines the relevance of recognising these aspects.
Files
F169010060224.pdf
Files
(474.7 kB)
Name | Size | Download all |
---|---|---|
md5:d860c3f419083545b882d0be8146a54d
|
474.7 kB | Preview Download |
Additional details
Identifiers
- DOI
- 10.35940/ijmh.F1690.10060224
- EISSN
- 2394-0913
Dates
- Accepted
-
2024-02-15Manuscript received on 25 January 2024 | Revised Manuscript received on 29 January 2024 | Manuscript Accepted on 15 February 2024 | Manuscript published on 28 February 2024.
References
- Arditi, D., Nayak, S., & Damci, A. (2017). Effect of organizational culture on delay in construction. International Journal of Project Management, 136-147. https://doi.org/10.1016/j.ijproman.2016.10.018
- Asim, M., Deep, S., & Ahmad, S. A. (2016). Analysis of Delays in Indian Real Sector Construction Projects and their Impact on Overall Project Performance. International Conference in Construction, Real Estate, Infrastructure and Project Management (pp. 1-10). Pune: International Conference in Construction, Real Estate, Infrastructure and Project Management.
- Assbeihat, J. M. (2016). FACTORS AFFECTING DELAYS ONPRIVATE CONSTRUCTION PROJECTS. International Journal of Civil Engineering and Technology (IJCIET), 22-23.
- Deep, S., Asim, M., Kesarwani, N., & Kandpal, S. (2018). Identification of Delay Causing Actor in the Indian Real Estate Project: an AHP-Based Approach. Baltic Journal of Real Estate Economics and Construction Management, 116-130. https://doi.org/10.2478/bjreecm-2018-0009
- Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 479-489. https://doi.org/10.1016/j.ijproman.2011.10.004
- Jonbi, Andreas, A., Arini, R. N., & Yuze, M. (2020). Analysis Of Delay Factors And Construction Claims Of Apartments And Commercial Building. Jurnal Infrastruktur, 39-45. https://doi.org/10.35814/infrastruktur.v6i1.1293
- Metha, R. L., & Gaikwad, S. V. (2017). Delays and its Analysis: Indian Residential Construction Projects. KICEM Journal of Construction Engineering and Project Management, 20-28.
- Toriola-Coker, O. L., Obisanya, A., & Oladitan. (2023). EXPLORING CAUSES OF DELAY IN NIGERIA BUILDING CONSTRUCTION INDUSTRY. EKSU, Faculty of Engineering 3rd Engineering Conference (pp. 23-34). Yaba, Lagos, Nigeria: EKSU, Faculty of Engineering 3rd Engineering Conference.
- Falqi, I. I. (2019). Assessment of Cost and Extent of Delays in Public Sector Construction Projects in Aseer Region, KSA. In International Journal of Recent Technology and Engineering (IJRTE) (Vol. 8, Issue 4, pp. 10390–10402). https://doi.org/10.35940/ijrte.d8131.118419
- Ewedafe, S. U., Hirowati, R., & Shariffudin. (2019). The Numerical Solution of Heat Equation by the Fourth-Order Iterative Alternating Decomposition Explicit Method with MPI. In International Journal of Engineering and Advanced Technology (Vol. 8, Issue 6s3, pp. 4–9). https://doi.org/10.35940/ijeat.f1002.0986s319
- Gujjar, S. V., Sawant, S., Kulkarni, A., R., C., Khabale, S. G., Mane, U. N., & Hunashyal, Dr. Anand. M. (2020). Analysing Delays of Construction Projects in Western Part of Mumbai: Causes and Effects. In International Journal of Innovative Technology and Exploring Engineering (Vol. 9, Issue 5, pp. 823–836). https://doi.org/10.35940/ijitee.e2609.039520
- Islam, M., Mohamed, S. F., Mahmud, S. H., M, A. K. A., & Saeed, K. A. (2020). Towards A Framework for Development of Operational and Maintenance Cost Model of Highway Project in Malaysia. In International Journal of Management and Humanities (Vol. 4, Issue 5, pp. 89–95). https://doi.org/10.35940/ijmh.e0530.014520
- Ramesh, G. (2021). Low Carbon Buildings for Sustainable Constructions. In Indian Journal of Structure Engineering (Vol. 1, Issue 2, pp. 1–4). https://doi.org/10.54105/ijse.b8003.111221