Workflow Optimization of Material Management Process by Digital Adoption in Indian Residential Projects
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
- 1. Assistant Professor, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
- 2. Post Graduate Student, Department of Architecture, School of Planning and Architecture, Vijayawada (Andhra Pradesh), India.
Description
Abstract: To analyze the present day’s material management process and the extent of digital adoption in the workflow; to identify the shortcomings in the present day’s practice; and to formulate digital inclusive framework to manage materials. Objectives 1 & 2 is achieved through 3 step process – Literature review to identify the related shortcomings (factors) and online/ web search to explore available technology; Survey(s) to assess the real time status on the factors, to identify more practical difficulties and the extent of digital adoption in the workflow; Interviewing seasoned professions to gather data in detail with respect to material. Objective 3 is achieved by comparison and analysis of the findings. Validation of the framework to assess the potential effects – Partial validation is performed as part of this study. Workflow involved in construction material management is optimized via framework. Autodesk Revit, MS Project, and MS Access are the 3 platforms proposed to be part of the framework that suits every phase of the process like Quantity survey and Estimation, Procurement Planning, Inventory, Purchasing and Store Management. Partial framework - MS Project has been validated and the results are – Ability to map the data efficiently; Précised Budget & material requirement identification resulted in an increase of 1% cost in the overall project budget; Easy Cross verification; Easy documentation; Data driven decision making; Multi - dimensional data visibility. The studies in the past have stressed on the benefits of digitalization and the willingness of construction sector in adopting the same. 2019, 2020 and 2021 studies have explored individual digital platform such as MSP, Primavera, and Revit in terms of part functions involved in material management. Whereas there is no study stating the order of workflow between these platforms for complete material management. Also, the studies in the past failed to identify and address the shortcomings related to the digital adoption. Hence, this study proposed a framework that determines the order of the workflow involved in material management between these digital platforms with an aim to optimizing the workflow.
Files
F168710060224.pdf
Files
(1.0 MB)
Name | Size | Download all |
---|---|---|
md5:59dcde086d83690694f790e9620b4daf
|
1.0 MB | Preview Download |
Additional details
Identifiers
- DOI
- 10.35940/ijmh.F1687.10060224
- EISSN
- 2394-0913
Dates
- Accepted
-
2024-02-15Manuscript received on 04 January 2024 | Revised Manuscript received on 10 January 2024 | Manuscript Accepted on 15 January 2024 | Manuscript published on 30 January 2024.
References
- A R. Patil, S V. Pataskar, (2013). Analyzing MM Techniques on Construction Project, International Journal of Engineering and Innovative Technology. 3(4), pp. 96-100 https://www.ijeit.com/Vol%203/Issue%204/IJEIT1412201310_16.pdf
- G. Kanimozhi, P. Latha, (2014). MM in Constuction Industry, Indian Journal of Applied Research, 4(4), pp. 1-3. DOI: 10.36106/ijar https://www.worldwidejournals.com/indian-journal-of-applied-researc h-(IJAR)/fileview/April_2014_1397196331_9479c_263.pdf
- Damstrom, M. Digitalization and Construction Project Management-What Consequences the Use of ICT-Tools Has Had on the Project Manager Role in the Construction Industry. Master's Thesis, Royal Institute of Technology, Stockholm, Swedish, 2020. https://doi.org/10.3390/su132212690
- Prebanić, Kristijan & Vukomanović, Mladen. (2021). Realizing the Need for Digital Transformation of Stakeholder Management: A Systematic Review in the Construction Industry. Sustainability. 13. 12690. https://doi.org/10.3390/su132212690.
- Shah, Harsh & Rajgor, Mamta & Jayeshkumar, Dr & Tech, M & Pitroda, Dr. Jayeshkumar. (2017). A critical literature review on implementation of primavera software on construction project. 5. 1483-1486. https://ijcrt.org/papers/IJCRT1704192.pdf
- Eshwari P. Uppin, Amey A. Kelkar (2019). Application of ABC Analysis for Material Management and Planning and Scheduling using MSP. Volume: 06 Issue: 07 e-ISSN: 2395-0056 p-ISSN: 2395-0072 https://www.irjet.net/archives/V6/i7/IRJET-V6I7138.pdf
- Pritilata H. Patorkar, DR. NW.Ingole (2021). Analysis on inventory management by using Microsoft project. International Journal of Scientific Research and Engineering Development - Volume 4 Issue 4. http://www.ijsred.com/volume4/issue4/IJSRED-V4I4P53.pdf
- https://www.projectcubicle.com/resource-loading-primavera-p6/
- https://consultleopard.com/best-construction-scheduling-software-prim avera-p6-vs-ms-project/
- Alhasan, Soleen & Amoudi, Omar & Tong, Michael & Kumar, Bimal. (2019). Effectiveness of Adopting BIM on Quantity Surveying Profession During the Project Life Cycle. https://www.arcom.ac.uk/-docs/proceedings/9922e5f879a0c625bb22a3 e5ac3b1e1d.pdf
- Rajesh Gangani, Amit N. Bhavsar, Raj Modi, "A Critical Literature Review on "Building Information Modeling (BIM) - Based Dynamic Inventory Control Model for Material Management in Construction Industry"", International Journal of Creative Research Thoughts (IJCRT), ISSN:2320-2882, Volume.6, Issue 2, pp.547-554, April-2018. :http://www.ijcrt.org/papers/IJCRT1812937.pdf
- Lee, M & Cheah, W & Lau, S & Lee, X & Abdullahi, A & Wong, Soon Yee. (2020). Evaluation of practicality of virtual design and construction (VDC) with 5D building information modelling (BIM) through a case study. IOP Conference Series: Materials Science and Engineering. 943. 012058. https://doi.org/10.1088/1757-899X/943/1/012058.
- https://www.smartsheet.com/content/workflow-optimization#:~:text= Workflow%20optimization%20is%20the%20use,and%20time%20spe nt%20completing%20tasks.
- https://www.cflowapps.com/simple-guide-for-workflow-optimization/# :~:text=The%20most%20obvious%20benefits%20of,business%20with out%20hampering%20business%20outcomes.
- https://www.financialexpress.com/money/changing-homebuyer-prefere nces-nri-demand-keep-luxury-housing-in-top-gear/2642697/
- https://www.financialexpress.com/money/the-future-of-luxury-housing -in-india/2654325/
- https://api.anarock.com/uploads/research/CII_ANAROCK_THE%20H OUSING%20MARKET%20BOOM_2023.pdf
- Pradeeba, K., & Rajasekaran, A. (2021). Analytical Predictions on Flexural Strengthening of Reinforced Concrete Beams with Hybrid FRP Laminate. In International Journal of Engineering and Advanced Technology (Vol. 11, Issue 1, pp. 15–20). https://doi.org/10.35940/ijeat.a3122.1011121 19.
- Sunitharam, Dr. C., Vinay, S., & Anand, S. (2022). Preserving Privacy and Security in Browser Case Study of Mantis Browser. In International Journal of Soft Computing and Engineering (Vol. 12, Issue 1, pp. 1–4). https://doi.org/10.35940/ijsce.a3544.0312122
- Ahmed, A. A., & Ismail, A. (2023). To What Extent Business Excellence Dimensions Affect the Resilience and Performance of Qatari Enterprise: A Conceptual Report. In Indian Journal of Management and Language (Vol. 3, Issue 1, pp. 5–11). https://doi.org/10.54105/ijml.a2054.043123
- Bakhtyar, A., Faqiri, A. F., Tasal, N., Mutahar, M., & Sheybani, S. (2023). Airflow Simulation in a Turbofan Engine: A Study of Flow Behavior. In Indian Journal of Production and Thermal Engineering (Vol. 3, Issue 6, pp. 1–5). https://doi.org/10.54105/ijpte.c7905.103623
- Muralidhar, P. (2019). Model for Identifying the Risk Level in Construction Projects. In International Journal of Recent Technology and Engineering (IJRTE) (Vol. 8, Issue 3, pp. 1343–1350). https://doi.org/10.35940/ijrte.b3345.098319