Scheduling and Monitoring of Arch Bridge Projects using Primavera P6: Best Practices and Case Studies

  • 1. Student,Department of Civil Engineering, Sanjeev Agarwal Global Educational University, Bhopal. M.P. India
  • 2. Assistant Professor, Department of Civil Engineering, Sanjeev Agarwal Global Educational University, Bhopal. M.P. India

Description

The essential objective behind the examination is to recognize the work job of observing and controlling the task progress of development and get plan of action distribution utilizing the executives instruments, for example, primavera P6. This was achieved through reconsidering the writing and systems utilized in checking and control. The review filled in as a guide for dissecting development progress and recognizing explicit issues that emerged during the cycle. The discoveries of the review uncovered the deficiencies of the ongoing venture the executives framework in project execution. Another task the board plan is finished that is both productive and savvy. By assigning more assets to project exercises, the time cost exchange of the task term can be brought down. In any case, doing so raises the venture's expense. For booking a bunch of undertaking errands, the basic course technique is utilized. Primavera programming was additionally utilized for asset examination.

This exploration presents the preparation and planning of a task arranged in Bhopal, Madhya Pradesh. The designation of assets is finished utilizing Primavera P6 to screen the functioning method of the undertaking in each stage.

Files

Scheduling and Monitoring of Arch Bridge Projects using Primavera P6 Best Practices and Case Studies.pdf

Additional details

References

  • 1. Phophalia, K., & Basu, R. (2018). Evaluation of Microsoft Project and Primavera P6 as Construction Project Management Software in India. International Journal of Innovations in Engineering Research and Technology, 5(3), 1-11.
  • 2. Amarendra, S. S., & Kodwani, H. MONITORING AND SCHEDULING OF AN ARCH BRIDGE USING PRIMAVERA.
  • 3. Pandit,Y, Kulkarni,S , Choulwar, Y, Kher S, Marawar S.D. (2017). Analysis of Planning and Scheduling Using Traditional and Primavera Approach. International Journal of Innovative Research in Science, Engineering and Technology.6(4).
  • 4. Subramani, T., & Chinnadurai, K. (2015). Construction Management and Scheduling of residential building using Primavera. International Journal of Application or Innovation in Engineering & Management, 93-103.
  • 5. Mallick Z, khan M.(2019).Construction Planning And Control Using Primavera P6. IJARIIE-ISSN(O)-2395-4396, 5(4).
  • 6. Sudarshan. S and Geena George, Comparison Of Project Planning & Scheduling Software Primavera And Microsoft Project Used In The Construction Industry, International Journal of Engineering Technologies and Management Research Septmber 2021 8(9), 78-87.
  • 7. Priya, K., Kathiresan, M., Vengateshwari, D., & Suriyakumari, M. (2019). Planning, Analysis and Construction Scheduling of Apartment Building (G+ 13) By Using Primavera P6. International Journal of Scientific Development and Research (IJSDR), 4(3), 204-213.
  • 8. Suchithra L, Anne Ligoria S (2017). Tracking and management of construction projects using primavera. International Research Journal of Engineering and Technology (IRJET), 4(7).
  • 9. Raghuwanshi N, Paliwal, M. C.(2021). Planning and Scheduling Construction Projects using Primavera Software: A Case Study, International Journal of Trend in Scientific Research and Development (IJTSRD).
  • 10. FathimaZerin T, Angela C. Joy, (2018). Construction Management Using Primavera, International Journal of Science and Research (IJSR) ISSN: 2319-7064.