H2020 ACCEPT project: D7.13 – Demonstration activity report from the Dutch pilot site v1.0
Description
This deliverable outlines the demonstration plan for the Dutch pilot site of the ACCEPT project, which aims to develop and test innovative energy solutions for local communities. The report provides an overview of the community's objectives, regulatory framework and the plan for demonstrating the use cases (UCs). The deliverable begins by summarizing the Dutch pilot site's assets and the modifications to the UCs that will be tested compared to D6.7. It then details the pilot test-bed for the Dutch pilot site designed to test the various use cases identified to be suitable. The expected timeline is a first idea about the demonstration activities, because of the many uncertainties in the current stadium. A more realistic plan will be presented in version 2 of the deliverable. Support activities will be provided to residents for installed meters in residential areas. This support will help residents understand how the equipment works and how to interpret the data provided by the meters. Finally, the deliverable also outlines the next steps for the pilot site. The next course of action involves completing the installation and commissioning phase, resolving any remaining issues, and beginning the demonstration phase following the timeline outlined in the report. The aim is to implement the UCs successfully and demonstrate the effectiveness of the ACCEPT solution for sustainable energy solutions in local communities. Overall, this deliverable provides a comprehensive report of the first part of the demonstration activities for the Dutch pilot site of the ACCEPT project.
Files
D7.13_Demonstration activity report from the Dutch pilot site v1.0.pdf
Files
(1.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:268d345ecae7c6fc90bffa1cdb9978a6
|
1.3 MB | Preview Download |