Published August 21, 2023
| Version v1
Report
Open
Impact Evaluation Interim Report (Towards a National Collection)
Creators
Description
This report was commissioned by the Towards a National Collection (TaNC) Programme Directorate of the appointed TaNC programme evaluator, the Diffley Partnership. This is an interim evaluation report containing findings for the period up to 27 July 2023. As such, the report analyses and distils the Phase 1 findings. These are primarily based on secondary sources, engagement sessions with people involved in completed TaNC projects, and a cultural heritage sector survey.
A second phase of this evaluation will commence in June 2024, concluding and reporting by end of November 2024.
Files
Impact Evaluation Interim Report.pdf
Files
(5.0 MB)
Name | Size | Download all |
---|---|---|
md5:c1ba41fc9c019c5fc5e327a0036b85ef
|
5.0 MB | Preview Download |
Additional details
Funding
- UK Research and Innovation
- Towards a National Collection Programme Directorate AH/V000802/1