Published June 14, 2023 | Version v1

Dynamic production scheduling for flat steel production

Description

Within the RFCS project DynReAct new concepts to improve the flexibility of production scheduling in flat steel production were developed and demonstrated at the tin-plate production site of thyssenkrupp Rasselstein in Andernach providing multiple production steps with free choice of multiple plants for production of a certain product.

The selected concept follows a hybrid scheduling approach combining three planning levels with different planning horizons as well as planning accuracies to provide robust production plans on the one hand and flexible reaction strategies in case of unexpected events or decreasing plant performances on the other hand.

Files

ESTAD2023_DynReAct.pdf

Files (263.9 kB)

Name Size Download all
md5:2835285d37e84d17fb98a025f344d15a
263.9 kB Preview Download