Published June 9, 2023 | Version v1

Brazil - Power Model 2050

  • 1. Aeronautics Institute of Technology and Delft University of Technologyand Delft
  • 2. Delft University of Technology
  • 3. Aeronautics Institute of Technology

Description

Installation and running the model

It is necessary to install Calliope to run the model. Instructions for installation and running the model are available at:https://calliope.readthedocs.io/.

Temporal resolution

The temporal resolution of the model is 8 hours by default. You can set the model with another resolution in the "overrides" file: 

time_resampling:

        model.time: {function: resample, function_options: {'resolution': '8H'}}

 

Please be aware that running the model might be computationally expensive. The model contains data from one year. If you wish to test the model, you can indicate a shorter time range in the "overrides" file > weather years. For example, you can select a subset of ten days of data:

    year_2010:
        model.subset_time: ['2010-01-01', '2010-01-10']

 

Weather year

Weather years include data from 2000 to 2019.

Scenarios

The scenario names are structured as follows: route + policy + year:

Routes: 

1) Baseline

2) Limited electrification (elec. stage 1)

3) Intensive electrification (elec. stage 2)

4) Net zero

Policy:

1) Default (status quo)

2) Land constraints (exclusion of relevant ecological lands)  (LC)

3) 100% renewable (RE) -  phase-out fossil fuels

4) Land constraints (LC) + 100% RE

Example:

scenario_netzero_banned_2019 (route=netzero, policy= phase-out fossil fuels)

 

Files

Brazil-Calliope.zip

Files (582.0 MB)

Name Size
md5:70a08bdce4888b45def5e75bf975cd4b
582.0 MB Preview Download