Published November 30, 2021
| Version v1
Project deliverable
Open
Videos 1 project intro video + 1 new video per year to update process + final conf video
Description
Deliverable D8.10 “Videos 1 project intro video + 1 new video per year to update process + final conf video” by REVOLVE MEDIA is a public demonstrator. It will include the following five videos:
1. The ‘Project Intro Video’ delivered in November 2021 (M6) – publicly available via this link.
2. ‘Project update video #1’ to be delivered in November 2022 (M18)
3. ‘Project update video #2’ to be delivered in November 2023 (M30)
4. ‘Project update video #3’ to be delivered in November 2024 (M42)
5. ‘Final conference video’ to be delivered in May 2025 (M48) as part of the final conference.
Files
D8.10_BBTWINS_Videos_1_project_video_v2_final.pdf
Files
(367.2 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:ac431d5fe1f7267cacf1463fd59f62e8
|
367.2 kB | Preview Download |