Quality management practices in building construction in Vadodara city
Authors/Creators
- 1. Student, Department Of Civil Engineering Parul Institute Of Technology, Parul Uniiversity P.O. Limda, Gujarat, India
- 2. Assistant Professor, Department Of Civil Engineering Parul Institute Of Technology, Parul Uniiversity P.O. Limda, Gujarat, India
Description
Vadodara, a city in the Indian state of Gujarat, is focus of this study, which will examine current methods for managing construction quality there. The study utilized a mixed methodology & mix of primary and secondary sources to gather information it needed to draw its conclusions. Tools for gathering information, questionnaires. In addition, the census approach was used to choose samples since there were not too many people involved. Survey questionnaire was developed using data gleaned from literature research & project documentation. There was a 100% response rate from survey questionnaire handed out to 126 workers in city of Vadodara who were picked at random. Analytical Hierarchy process (AHP) analysis was used to understand, alter, and assess the central concept and conclusions of data acquired via questionnaire. Descriptive analytics is kind of statistical analysis utilized to examine & summarize data from surveys and other types of queries. Questionnaires using the Saaty scale were used to gauge the responses of respondents to a certain event or characteristic. They were tasked with assessing the importance of various building facilities management application components & root causes of any difficulties they encountered while doing so. Examining Two Items Separately There are nine levels of significance, from least to most: (1) equal significance, (3) medium significance, (5) strong significance, (7) extremely strong significance, & (9) extreme significance (2,4,6,8). Many respondents understood quality & quality management, but their use of these ideas was poor, according to the study. Numerous writers have also noted that inadequate knowledge is the primary barrier to implementing quality management procedures. Several variables for effectiveness of quality management methods are also highlighted.
Files
Files
(342.6 kB)
| Name | Size | |
|---|---|---|
|
md5:cd2e31c0c6f66b8451427756e56e4969
|
342.6 kB | Download |
Additional details
References
- 1. Al-Zayyat, A. N., Al-khaldi, F., Tadros, I. and Al-Edwan, G. (2010). The Effect of Knowledge Management Processes on Project Management. Journal of IBIMA Business Review. 2010(2010). 1-6 2. American Society for Quality, what is quality? Available at: http://www.asq.org, (accessed on February 15, 2016) 3. Asefa, B. (2018). Assessment of Quality Management Practices of Ethiopian Contractors Focused on building construction projects. (Master's Thesis). Addis Ababa University, Ethiopia. 4. Ashok Kumar, D. (2014). Study of Quality Management in Construction Industry. International Journal of Innovative Research in Science, Engineering and Technology. 3(1), 36-43. 5. Azlan S. Ali and Ismail Rahmat; 25th September 2009. "The performance measurement of construction projects managed by ISO-certified contractors in Malaysia".