Published March 15, 2023 | Version v1

JUSTIFICATION OF THE DISTANCE BETWEEN SHORT TOPS ON THE WORKING HORIZONS OF THE MINE WHEN USING LOADING AND DELIVERY MACHINES

  • 1. Navoi State University of Mining and Technologies Associate Professor of the Department of Mining
  • 2. Navoi State University of Mining and Technologies Doctoral student of the Department of Mining
  • 3. Navoi State University of Mining and Technologies 13a-21 KI (OKI) group student

Description

To the article the worked out is driven on the basis ofresearches, methodology of choice of optimal distancebetween crossheadings in mine horizon at development ofhigh-dipping tendon deposits of different power with the useof self-propelled technique and offered graphic results forengineering calculations.

Files

116-121.pdf

Files (423.5 kB)

Name Size
md5:0adecda5caebded9cc803259e30c209e
423.5 kB Preview Download

Additional details

Related works

Is cited by
Journal article: 10.5281/zenodo.7738785 (DOI)