JUSTIFICATION OF THE DISTANCE BETWEEN SHORT TOPS ON THE WORKING HORIZONS OF THE MINE WHEN USING LOADING AND DELIVERY MACHINES
Authors/Creators
- 1. Navoi State University of Mining and Technologies Associate Professor of the Department of Mining
- 2. Navoi State University of Mining and Technologies Doctoral student of the Department of Mining
- 3. Navoi State University of Mining and Technologies 13a-21 KI (OKI) group student
Description
To the article the worked out is driven on the basis ofresearches, methodology of choice of optimal distancebetween crossheadings in mine horizon at development ofhigh-dipping tendon deposits of different power with the useof self-propelled technique and offered graphic results forengineering calculations.
Files
116-121.pdf
Additional details
Related works
- Is cited by
- Journal article: 10.5281/zenodo.7738785 (DOI)