Published January 17, 2023
| Version 1.0
Project deliverable
Open
D3.2 Integration of the INCEPTION 3D and H-BIM technologies
Description
The main objective of the Deliverable is to reports on the integration of INCEPTION technologies, and their current advancement beyond the results achieved during the INCEPTION project (g.a. 665220), in 4CH cloud platform. Activities have started at Month 13 (January 2022) but are still under development. Thus, the results contained in this deliverable will be further explored towards the end of the project.
Files
D3_2.pdf
Files
(2.5 MB)
Name | Size | Download all |
---|---|---|
md5:7e15866ab41f5277a2d528790380f5b5
|
2.5 MB | Preview Download |