Published July 11, 2022
| Version v1
Project deliverable
Open
Landscape analysis and cost analysis (D8.13)
Description
This deliverable serves as an interim report on the progress towards the final sustainability plan as crafted by work packages with the methodology and support from WP8. It outlines the steps that have been taken so far and provides an overview of the internal landscape of exploitable assets within the ConcePTION ecosystem, as well as the external landscape of successful IMI projects.
Files
D8.13 Landscape analysis and cost analysis.pdf
Files
(1.3 MB)
| Name | Size | Download all |
|---|---|---|
|
md5:fc9985d9717a787cb1b15e5e9e85a88b
|
1.3 MB | Preview Download |