Causes of Obstacles in the Implementation of Construction Projects
Authors/Creators
Description
In construction projects in Aceh Province, obstacles often occur in project implementation, both obstacles that have been calculated and obstacles that are beyond the calculations of project planners. These obstacles were the cause of the delay in project completion so that the project did not proceed according to plan, in this case, the irrigation project of the Aceh Province. where there are frequent delays, both technical and non-technical. This research was conducted as an effort to identify the main factors causing obstacles in the irrigation project, this research was conducted by distributing questionnaires to the respondents. Questionnaire data were processed using descriptive statistical methods. The dominant indicator that causes delays in the implementation of irrigation projects in Aceh Province based on the results of the study was the lack of work experience with a mean value of 4.55.
Notes
Files
IJSRED-V6I1P17.pdf
Files
(273.6 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:bcf5bc2c5f343357aad604569217ee6e
|
273.6 kB | Preview Download |