Published October 29, 2022 | Version v1

Mixed Reality and BIM applied to Construction Health and Safety

  • 1. University of Minho, ISISE, Department of Civil Engineering, Guimarães, Portugal
  • 2. Hilti Group, Schaan, Liechtenstein
  • 3. BIMTEC, Doha, Qatar

Description

In construction, site operations are complex. Construction workers perform a diversity of activities, each often associated with a multitude of risks. Those risks are generally extended to many workers in the vicinity of the operational areas where the activities happen. As such, the construction sector is known for recording a high rate of accidents. Despite the large effort in the analysis of design solutions, planning of activities, education, and awareness of site agents, improvements are required. Our field experience shows that live field CHS management is mostly manual and fragmented. Furthermore, the lack of integration between the digital world and the physical world, especially the interaction between data analysis and the corresponding measures, has led to information fragmentation and data duplication, and stagnation between the different phases of the construction life cycle. events on a construction site are dynamic and constantly changing in terms of facilities, equipment, materials, people, site layout, and various other components at different stages. This increases the complexity of safety monitoring and management of construction sites.

We propose the development of a framework for a Digital Twin application based on a BIM model representing the conditions during the construction stage. This is further enriched with hazards and allows to collection of data from sensors on-site to improve the monitoring and recording behaviour of construction workers. This framework can be used to create live alerts to one or multiple workers, contributing to mitigating the number of casualties in the industry. Beyond addressing the gap between on-site operation and office controls, Beyond addressing the gap between on-site operation and office controls, our proposal allows creating a database to analyse incidents and inform decisions based on a on the data stores in the BIM model. This model can also be easily updated to better represent each moment of the construction stage (4D BIM), serving as an important tool for the training of those who collaborate in its physical space.

Files

29_BIM_A__conference_2022.pdf

Files (128.8 kB)

Name Size
md5:7fe87bf1759b1eeb9db6cf8617d665ae
128.8 kB Preview Download