Project deliverable Open Access

D4.5 Virtual Commissioning Model

Rehan Khan

This document describes the developed configuration management processes and illustrates them using the demonstration projects. The established process enables consistency among the requirements specified during the planning/design phase and the installations done during the as-built stage based on digital twin data. Additionally, the document also describes the developed conceptual configuration management process by identifying key areas of the process for the construction project’s lifecycle. Finally, the demonstration is done for the configuration and quality management processes on the construction phase demo sites.

Files (2.0 MB)
Name Size
ASHVIN_Deliverbale_D4.5_Final.pdf
md5:1b04e707d7fac39fbf4c91a96b1414cb
2.0 MB Download
41
28
views
downloads
All versions This version
Views 4141
Downloads 2828
Data volume 57.3 MB57.3 MB
Unique views 3333
Unique downloads 2727

Share

Cite as