Published September 20, 2022 | Version v1

Measuring Time Dependent Stress-Changes around a Driven Pipe Pile in Medium Dense Sand

Authors/Creators

  • 1. Federal Waterways Engineering and Research Institute (BAW)

Description

Time dependent changes of pile capacity in sands are often attributed to a decrease of arching effects in the surrounding
soil following pile driving. This effect is assumed to lead to a gradual increase of radial stresses acting on the pile shaft
and thus on an increase in pile capacity. This time dependent increase is referred to as pile setup. As part of an R&D
project of Germanys Federal Waterways Engineering and Research Institute (BAW) one open ended pipe pile was
equipped with combined total stress and pore water pressure sensors in order to investigate effective stress changes
over a measurement period of almost 5 years. Additionally, after 28 months, two pairs of strain transducers and
accelerometers were installed at the pile head and toe for stress wave measurements during pile installation and redriving.
The pile was driven at a harbour site that is subject to tidal water level changes. The measurements revealed
a decrease rather than an increase in radial stresses, all though the pile capacity increased over time following
evaluation of the stress wave measurements.

Files

SW2022Kidane.pdf

Files (6.6 MB)

Name Size
md5:357f260f858a7e4f2ac3004ef60ba199
6.6 MB Preview Download