Dataset Open Access

CSP.guru 2022-07-01

Richard Thonig; Johan Lilliestam

This version of CSP.guru has been compiled by Richard Thonig in collaboration with the SolarPACES secretariat and reflects the CSP market in the middle of 2022. The Chinese market develops favorably with many new projects announced to be completed by 2024. At the end of 2021, the beam-down tower project was completed with 5 out of 15 initially planned towers completed. Staying conservative, we only include those projects that are reported as under construction but keep a close eye for coming updates. In South Africa Redstone is finally under construction. Moreover, several pilot stations moved forward. We deleted three plants because we couldn't verify that they are under construction or will still be completed after the Chinese Feed-in-Tariff ran out at the end of 2021, thos are: OpenCSP_ID 132,133,134 "Shenzhen Jinfan Akesai - 50MW Molten Salt Trough", "Shouhang Yumen 100 MW Tower", "Supcon Delingha 135 MW Tower".

Files (125.1 kB)
Name Size
repolicy/csp-guru-2022-07-01.02.zip
md5:94beccfc183e58862881b055c684d684
125.1 kB Download
4,654
2,666
views
downloads
All versions This version
Views 4,654332
Downloads 2,666230
Data volume 221.8 MB28.8 MB
Unique views 3,834302
Unique downloads 2,456227

Share

Cite as