Published June 30, 2022
| Version v1
Dataset
Open
CBA Thinking Fadura
Description
Data and calculation for the Cost Benefit Analysis (CBA) for Thinking Fadura Park.
Deliverable 5.3: Cost-benefit analysis for four INHERIT case studies: Thinking Fadura.
Files
Files
(42.9 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:98bafbd828eaab768aa5724da81d7205
|
42.9 kB | Download |