Demonstration of HDM-4 in Evaluating Different Investment Alternatives for Unpaved Road
Authors/Creators
- 1. BVM Engineering College, Vallabh Vidya Nager, Anand India.
Description
In the context of under-developing countries like Afghanistan, poverty can be reduced by proper management and effective use of infrastructure budgets and the provision of labour-intensive construction projects. The labour-intensive work approach has the potential to boost livelihoods in the short term, create new small businesses in road maintenance and construction, encourage workers to save and invest wages in other types of new micro-enterprises, and improve critical road infrastructure for long-term economic growth. The use of the HDM-4 model is demonstrated in this study in defining road improvement and maintenance works and selecting the optimum maintenance and rehabilitation strategies available for the road sector in Afghanistan under the constrained budget available for the road sector. This study presents the economic analysis and justification of upgrading an existing engineered gravel road to a paved standard, evaluating eight different investment options. The existing road is 22.02 km long and passes through hilly terrain.
Files
Maiwand KJET- 3.1-2021-02 Demonstration of HDM-4 in Evaluating Different Investment Alternatives for Unpaved Road19012022115854.pdf
Files
(237.5 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:ba834d40493be5ff152f71b69be5c4f8
|
237.5 kB | Preview Download |
Additional details
References
- [1] Bagui, S. K., & Ghosh, A. (2015). Level 1 Calibration of HDM-4 Analysis with a Case Study. Malaysian Journal of Civil Engineering, 27(1). [2] Čutura, B., Mladenović, G., Mazić, B., & Lovrić, I. (2016). Application of the HDM-4 model on local road network: a case study of the Herzegovina-Neretva Canton in Bosnia and Herzegovina. Transportation Research Procedia, 14, 3021-3030. [3] Dissanayake, S., & Patel, H. S. (2016). Gravel road paving guidelines (No. Report No. K-TRAN: KSU-14-1). Kansas. Dept. of Transportation. Bureau of Research. [4] Khasnabis, S., Mishra, S., & Safi, C. (2012). Evaluation Procedure for Mutually Exclusive Highway Safety Alternatives under Different Policy Objectives. Journal of Transportation Engineering, 138(7), 940-948. [5] Mohapatra, D. R. (2015). An Economic Analysis of Improvement of Road Infrastructure: A Case Study. European Academic Research, 2(11). [6] Paterson, W. D. (1987). Road deterioration and maintenance effects: Models for Planning and Management. [7] Schultz, G. G., & Stewart, A. L. (2007). Evaluating Economic Analysis Alternatives in the Transportation Decision Making Process. In International Conference on Transportation Engineering 2007 (pp. 3133-3139). [8] Schutte, I., Van Niekerk, D., Pienaar, W., & Bester, C. (2004). RED model customised for South Africa: roads. IMIESA, 29(2), 50. [9] Selim, A. A., Skorseth, K. O., & Muniandy, R. (2003). Long-lasting gravel roads: A case study from the United States. Transportation Research Record, 1819(1), 161-165. [10] Talvitie, A. (2000). Evaluation of road projects and programs in developing countries. Transport Policy, 7(1), 61-72. [11] Tomek, R., & Vitásek, S. (2016). Improvement of economic effectiveness of road highway projects. Procedia Engineering, 164, 395-401. [12] Visintine, B. A., Hicks, R. G., Cheng, D., & Elkins, G. E. (2015, June). Factors affecting the performance of pavement preservation treatments.