Published April 20, 2022
| Version v1
Dataset
Open
CROSSBOW HLU2-UC7-TC4 Real curtailment required to reduce cross-border congestion
Description
This dataset summarizes the amount of energy that should be curtailed in order to obtain the desired reduction at the monitored cross-border line.
This amount is not linear and depending on the congestion size, the curtailment cost might be really expensive. This data summarizes the KPI results of analysing the real curtailment requirements when facing different congestions. Two scenarios are considered:
- In the line between substations GKORIN and G1ARGOS
- In the line between substations G2PATR31 and GSIMOP31
For each unit of power reduction needed (x-axis) the corresponding curtailment required is presented (y-axis)
Files
Files
(28.1 kB)
| Name | Size | Download all |
|---|---|---|
|
md5:0bf008f2805b229e4b76055d2e9ba53f
|
28.1 kB | Download |