Published November 20, 2018 | Version v1
Conference paper Open

The Importance of Introducing Modern Management Strategies in the Power System and the Role of Diagnostic Center in It

  • 1. Electrical Engineering Institute "Nikola Tesla", University of Belgrade, Belgrade, Serbia
  • 2. School of electrical engineering, University of Belgrade, Belgrade, Serbia

Description

 In the Electric Power System (EPS), as a technically complex and distributed system with a layered organizational and management structure, it is very important to improve the electricity production, distribution and transmission, as well as introduce the new management and decision-making strategies. The paper presents the place and role of currently actual strategies, theories and algorithms of management and decision making with their basic characteristics. Several management strategies and engineering approaches have been modified and adapted to the needs of EPS. Modified and improved asset management (AM) strategy is presented in detail, which can be, partly or in whole, applied at all levels of governance and making decision. A significant place in the work occupies a description of the diagnostic center (DC). Its potential role in the in the EPS hierarchy is described in detail. Keyword:  In the Electric Power System (EPS), as a technically complex and distributed system with a layered organizational and management structure, it is very important to improve the electricity production, distribution and transmission, as well as introduce the new management and decision-making strategies. The paper presents the place and role of currently actual strategies, theories and algorithms of management and decision making with their basic characteristics. Several management strategies and engineering approaches have been modified and adapted to the needs of EPS. Modified and improved asset management (AM) strategy is presented in detail, which can be, partly or in whole, applied at all levels of governance and making decision. A significant place in the work occupies a description of the diagnostic center (DC). Its potential role in the in the EPS hierarchy is described in detail. 

Files

Manuscript-EEI2018.pdf

Files (321.8 kB)

Name Size Download all
md5:fe54ff2fc19d3f7dd9ab0d0375a439d8
321.8 kB Preview Download

Additional details

Funding

Ministry of Education, Science and Technological Development
Energy efficiency Improvement of Hydro and Thermal power plants in EPS by development and implementation of power electronics based regulation and automation equipment 33020
Ministry of Education, Science and Technological Development
Increase of power efficiency, reliabillity and availability of EPS power plants by asserting capability curves of generators and by applying new methods of testing and remote monitoring 33024