Network origin-destination data
Description
The first sheet has the tonnage data for each of the 440 routes. Each of these routes is connecting some of the 72 segments, which are entered in Columns B and C.
Name of the routes/segments in the original format are provided in the second sheet. Column C has the names of the segments.
The third sheet has the cost of dredging each of the segments entered in Column A at different depths that are entered in Columns B to L
The fourth sheet has the tonnage capacity of each route entered in Column A after dredging at different depths entered in Columns B to L
The fifth sheet has the required number of vessels to meet the demand after dredging each of the routes entered in Column A at different depths entered in Columns B to L
The sixth and seventh sheets have water routes entered in Column A that carries some demand to the destination and from the origin
The eighth sheet has the freight demand on each OD entered in Column A