Published December 31, 2016 | Version v1

CHPM2030 Deliverable D1.3: EGS-relevant review of orebody structures

Description

This document provides the results of laboratory investigations on ore samples wich represent the study sites of the CHPM2030 project, completed with samples from other ore types. The results are evaluated with a relevancy to the CHPM technology. The methodology for rock stress and strength measurements is also described. These measurements will be carried out in the frame of WP2 and will complete the EGS relevant properties of different ore body types determined in the recent study.

Files

CHPM2030_D1.3_public.pdf

Files (10.2 MB)

Name Size
md5:69ff30f0ba94f77781dc622c1a1eb502
10.2 MB Preview Download

Additional details

Funding

European Commission
CHPM2030 - Combined Heat, Power and Metal extraction from ultra-deep ore bodies 654100