Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published June 17, 2013 | Version v1
Presentation Open

ESA SST CCI L4 reanalysis using the OSTIA system

  • 1. ESA/ESTEC, The Netherlands

Description

Presentation given at the 14th GHRSST science meeting (XIV), Woods Hole, MA, USA, June 17 - 21, 2013.

Files

GXIV-6-1-roberts-jones_GHRSST2013_CCI.pdf

Files (2.0 MB)

Name Size Download all
md5:2026359707b8abd0e0000255b5500a5f
2.0 MB Preview Download