Journal article Open Access

Effective Selection of Resources for Construction using Program Tool

G. Dhanasekar; A. Sivakumar; L. Madhumitha; P. Karthikeyan

Sponsor(s)
Blue Eyes Intelligence Engineering & Sciences Publication(BEIESP)

In the Indian scenario construction industry facing a major problem is cost and time overrun. Effective time performance and cost performance are very important to execute the project in a successful manner by keeping them within the prescribed schedule and cost. Overall cost and duration of construction projects affected by the effective resource selection factor. This paper's objective is to rectify the improper selection of resources by a programming tool. Field survey and codebook study did collect the needed data to feed in the programming tool. The prepared tool gets distributed and making to access by every stakeholder of construction projects. This may result in the selection of construction resources as effectively. The term cost overrun in the resource part will be reduced.

Files (730.8 kB)
Name Size
C5411029320.pdf
md5:a00a8e3fd69fcd59012a6a0c3e02c8ec
730.8 kB Download
22
10
views
downloads
Views 22
Downloads 10
Data volume 7.3 MB
Unique views 19
Unique downloads 10

Share

Cite as