Journal article Open Access

Simultaneous Scheduling of Machines and AGVs in FMS Through Ant Colony Optimization Algorithm

M. Nageswara Rao; S. Vara Kumari; P. Manohar; B. Madesh; P. Naveen Krishna; R. Suraj Krishna Sai

Sponsor(s)
Blue Eyes Intelligence Engineering & Sciences Publication (BEIESP)

High amount of flexibility and quick response times have become essential features of modern manufacturing systems where customers are demanding a variety of products with reduced product life cycles. Flexible manufacturing system (FMS) is the right choice to achieve these challenging tasks. The performance of FMS is dependent on the selection of scheduling policy of the manufacturing system. In Traditional scheduling problems machines are as considered alone. But material handling equipment’s are also valuable resources in FMS. The scheduling of AGVs is needed to be optimized and harmonized with machine operations. Scheduling in FMS is a well-known NP-hard problem due to considerations of material handling and machine scheduling. Many researchers addressed machine and AGVs individually. In this work an attempt is made to schedule both the machines and AGVs simultaneously. For solving these problems-a new metaheuristic Ant Colony Optimization (ACO) algorithm is proposed.

Files (553.8 kB)
Name Size
C5410029320 (1).pdf
md5:dd5a2312c3504028b34a56af1dd3d8b9
553.8 kB Download
25
8
views
downloads
Views 25
Downloads 8
Data volume 4.4 MB
Unique views 22
Unique downloads 8

Share

Cite as