Planned intervention: On Wednesday April 3rd 05:30 UTC Zenodo will be unavailable for up to 2-10 minutes to perform a storage cluster upgrade.
Published December 17, 2020 | Version 1.0
Poster Open

CRC/TRR 270 Z-INF - Inside a multidisciplinary joint project

  • 1. TU Darmstadt
  • 2. Universität Duisburg-Essen

Description

Poster über das Z-INF Projekt des SFB/TRR 270 HoMMage, präsentiert auf dem HeFDI Plenary 2020.

Files

HeFDI_plenary2020_TRR270_ZINF_MG.png

Files (2.5 MB)

Name Size Download all
md5:ae2a11dbe328445e23070bfab12d5435
2.5 MB Preview Download