Published April 29, 2021 | Version v1
Journal article Open

Robust Scheduling of Waste Wood Processing Plants with Uncertain Delivery Sources and Quality

  • 1. InnoRenew CoE; Department of Information Sciences and Technologies, University of Primorska
  • 2. Department of Information Technology, Széchenyi István University
  • 3. Department of Information Technology, Széchenyi István University; Institute of Informatics and Mathematics, University of Sopron

Description

While the study of reverse wood value chains has become an important topic recently, optimization-focused studies usually consider network-level problems and decisions, and do not address the individual processes in the network. In the case of waste wood, one such important process is the scheduling of the various machines in a waste wood processing facility to treat incoming wood deliveries with multiple sources and varying quality. This paper proposes a robust multiobjective mixed-integer linear programming model for the optimization of this process that considers the uncertain origins and compositions of the incoming deliveries, while aiming to minimize both lateness and energy consumption. An exhaustive study is performed on instance sets of different sizes and structures to show the efficiency and the limits of the proposed model both in single- and multi-objective cases.

Files

sustainability-13-05007-v2.pdf

Files (372.8 kB)

Name Size Download all
md5:2f28e2b0dd542ada97853e1a5f761616
372.8 kB Preview Download

Additional details

Identifiers

ISSN
2071-1050

Funding

InnoRenew CoE – Renewable materials and healthy environments research and innovation centre of excellence 739574
European Commission